FIRST STAGE
PREPARATION OF SITE
The installation site is excavated either manually or with the aid of machinery. This is entirely dependent upon the condition of the existing driveway, patio or pathway.
Preparation takes between 1 and 2 days, however this may alter on larger installations, or installations that require more groundwork to be undertaken, i.e. removal of trees, bushes or shrubs, or the removal of an existing wall.
Once excavation of the site has been undertaken any manholes, gullies and drainage will be installed prior to the site being covered with MOT grade 1. The area is then levelled out and then compacted with a plate compactor.
The shuttering will then be positioned and fixed to the desired shape. All levels and falls will be checked at this point.
IT’S ALL SYSTEMS GO NOW
PREPARATION OF SITE
The installation site is excavated either manually or with the aid of machinery. This is entirely dependent upon the condition of the existing driveway, patio or pathway.
Preparation takes between 1 and 2 days, however this may alter on larger installations, or installations that require more groundwork to be undertaken, i.e. removal of trees, bushes or shrubs, or the removal of an existing wall.
Once excavation of the site has been undertaken any manholes, gullies and drainage will be installed prior to the site being covered with MOT grade 1. The area is then levelled out and then compacted with a plate compactor.
The shuttering will then be positioned and fixed to the desired shape. All levels and falls will be checked at this point.